The Pool started with a much smaller idea to erect a Log Cabin adjacent to the Studio with a single Endless Pool and treadmill. Aspirations grew as we attempted to match the look and feel of the original Studio and Planning Permission was granted in July 2015 for a stand alone pool barn to house a new dual propulsion Endless Pool with double treadmills.
Work started in November 2015 and the pool was finished by May 2016. An enclosed link corridor between pool and Studio was built in 2018.
Since the original build the pool has been retiled throughout and in March 2021 the changing room and shower rooms were completely refurbished ready for reopening after the COVID pandemic.